Bimini Basin Mooring Field Project

See More City Projects >>

Scope of work:
This project includes all of the design and permitting required to construct a 15-buoy mooring field in the Bimini Basin at Four Freedoms Park.  Additional infrastructure includes the removal and replacement of the existing park seawall, a dinghy dock, a modular building (e.g., public and private restrooms, a shower, a laundry room, and a storage room), a pump out station, a Captain’s walk, and connecting sidewalks. 

Timeline:
As of October 2025, approximately 30% of the plans have been completed for the dinghy dock, pump out dock, gangway, and modular building floor plan. The Mooring Field Management Plan has also been substantially completed for permitting.


proposed mooring field
Proposed layout of the mooring field